823 RED HORSE SQUADRON
PROJECT Silver Flag - Crushing
LOCATION:  Tyndall Air Force Base - Panama City, FL
AWARD DATE10/28/2011
FINISH DATE:  3/9/2012
ARCHITECT/DESIGN TEAMN/A
OWNERTyndall AFB
CONTRACTING OFFICER:  Melissa J. Blair
                        Phone:   850-283-0061
SCOPE OF WORKProvide all labor, tools, and materials needed to pre-screen debris to remove all materials already 2" in diameter in accordance with the Statement of work.
CONTRACT VALUE:  $314,550.00

 
PROJECTReplace Fuel Tank 1917
LOCATION:  Pensacola Naval Air Station
AWARD DATE12/13/2011
FINISH DATE:   4/20/2012
ARCHITECT/DESIGN TEAM:
OWNER:   Department of the Navy
               Navy Facilities Engineering Command Southeast
                    Jacksonville, FL 32212-0030
CONTRACTING OFFICER:  Trudale A. Corbin
                         Phone: 850-452-3131 ext. 3066
SCOPE OF WORK:  Provide all labor, materials, and equipment to replace the existing diesel tank.  The intent of this project is to provide a complete and usable fuel storage facility.
CONTRACT VALUE$46,839.10 

 
PROJECT:   Install EOD Entry System - Building 729
LOCATION:   Tyndall Air Force Base - Panama City, FL
AWARD DATE9/17/2011
FINISH DATE:  2/10/2012
ARCHITECT/DESIGN TEAMN/A
OWNER:   Tyndall AFB
CONTRACTING OFFICER:  Scott Brindus
                        Phone:   850-283-8648
SCOPE OF WORKInstallation of a Scramble Proximity Reader, Embedded Line Model, Velocity Software, exterior heavy duty mounting box, enrollment station, 18/10 Connectivity, 1200 lb Maglock with bond sensor, 120 Vac surge, 600 VA UPS, Request to exit motion detector, request to exit push button, wire management, 37 bit proximity cards, PW supply, and a single sided badge printer system.
CONTRACT VALUE$22,617.59

 
PROJECTDemo 5 Buildings
LOCATION:  Tyndall Air Force Base - Panama City, FL
AWARD DATE9/22/2010
FINISH DATE:   11/15/2011
ARCHITECT/DESIGN TEAMN/A
OWNER Tyndall AFB
CONTRACTING OFFICER:  Scott Brindus
                        Phone:  850-283-8648
SCOPE OF WORKProvide demolition and associated sitework for buildings 743, 939, 968, 1027, and 1257. In accordance with State and Federal Guidelines; Provide asbestos abatement as identified in site surveys and clearance air monitoring.
CONTRACT VALUE$776,139.69



PROJECTRepair Roof Leaks and Roof Replacement at Tampa Prevention along with Roof Replacement at Sector St. Petersburg
LOCATION:  United States Coast Guard Sector St. Petersburg Prevention
                155 Columbia Drive, Tampa, FL 33606
                                    and
                 USCG Sector St. Petersburg
                 600 8th Ave. SE St. Petersburg, FL 33701
START DATE9/17/2011
FINISH DATE:  9/27/2011
ARCHITECT/DESIGN TEAMN/A
OWNER:   United States Department of Homeland Security
              United States Coast Guard
  CONTRACTING OFFICER:  Rea L. Hughes
                        Phone:  305-415-7083
SCOPE OF WORK:  Replace roof decking, removal and replacement of roof curbing and flashing as needed at Tampa and St. Petersburg locations.  Perform tuck pointing and other waterproofing services as needed.  Power wash and apply sealant when finished with all areas.  Replace and refill roof gravel areas as needed.  Provide five year warranty on all roof work.
CONTRACT VALUE:  $29,182.21


  

 
PROJECT:  Repair to Sewage System
LOCATION:
  United States Coast Guard Station Sand Key - Clearwater, FL
START DATE:  7/6/2010
FINISH DATE:
  8/18/2011
ARCHITECT/DESIGN TEAM:  N/A
OWNER:   United States Department of Homeland Security
                  United States Coast Guard
CONTRACTING OFFICER:  Rea L. Hughes
                                Phone:  305-415-7092
SCOPE OF WORK:   Repair the sewage pipe in-situ as per manufacturer's specifications.  Clean the 3" pipe of all debris and calcite scale from vertical to the main sewer line approximately 30'.  Clean 6" pipe of all debris and calcite scale on main sewage line from manhole cover to manhole cover approximately 175'.  Copy of video inspection provided to Coast Guard.
CONTRACT VALUE:  $41,662.00

PROJECT:   Clean HVAC System at Child Care Center Building 3634
LOCATION:
  Naval Air Station Pensacola, FL
START DATE:  4/25/2011
FINISH DATE:
  5/25/2011
ARCHITECT/DESIGN TEAM:  N/A
OWNER:    Department of the Navy
               Navy Facilities Engineering Command Southeast
                    Jacksonville, FL 32212-0030
CONTRACTING OFFICER:  Trudale A. Corbin
                        Phone:   850-452-3131 ext. 3066
SCOPE OF WORK:  Provide all labor, materials, equipment and supervision necessary to inspect and clean the HVAC System including any interior surfaces of the facility's air distribution system for the conditioned spaces and occupied zones.  This includes the entire heating, air condition, and ventilation system.  Perform indoor quality air tests and replacement of breached flex duct.
CONTRACT VALUE:  $45,123.52

 
PROJECT:   Eglin 380 AHU-VAV
LOCATION:
  Eglin Air Force Base - Ft. Walton Beach, Florida
START DATE:  10/31/2011
FINISH DATE:
  Ongoing
ARCHITECT/DESIGN TEAM:  N/A
OWNER: Eglin AFB
CONTRACTING OFFICER:
  Yolanda Collins
                        Phone:  850-882-9247
SCOPE OF WORK:    Furnish all labor, equipment, and materials to convert existing HVAC multi-zone air handling unit (AHU) system to a variable air volume (VAV) system at building 380
CONTRACT VALUE:  $1,126,545.11

PROJECT:   Hollywood Casino at the Speedway
LOCATION:  777 Hollywood Casino Boulevard
                 Kansas City, KS 66111
START DATE:   4/14/2011
FINISH DATE:
    8/1/2011
ARCHITECT/DESIGN TEAM:  N/A
OWNER:  Penn National Gaming, Inc.
             12831 Jacob Grace Court
                  Windermere, FL 34786
PRIME CONTRACTOR:  Allied Construction Services, Inc.
                                   4700 Roe Parkway
                                   Roeland Park, KS 66205
POC:  Bruce Meyer-Project Manager
   Phone:  913-321-3170
SCOPE OF WORK:  Provide all labor, materials, and equipment necessary to perform 70,000SF of cement plaster stucco and about 6,000SF of EIFS work, complete, including the lathing, scaffold and lifts, etc... on the new 260,000SF Hollywood Casino Project at turn 2 of the Kansas City Speedway
CONTRACT VALUE:  $880,550


PROJECT:   Addition to Duke Field Building 3105
LOCATION:  Duke Air Force Base - Ft. Walton Beach, FL
START DATE:   10/15/2010
FINISH DATE:   7/20/2011
ARCHITECT/DESIGN TEAM:  N/A
OWNER: Duke AFB
CONTRACTING OFFICER:
  Marina Hobson
                        Phone:   850-882-0245
SCOPE OF WORK:  Construct new single story building with concrete floor, CMU with Brick veneer, steel joists and metal roof, overhead door, hollow metal doors, frames and hardware, canopies and related mechanical, plumbing, electrical and civil/site appurtenances. 
CONTRACT VALUE:  $705,413.00

  PROJECT:  Renovate / Addition to Building 225 and Pavilion
LOCATION:
  Tyndall Air Force Base - Panama City, FL
START DATE:  8/21/2009
FINISH DATE:
  5/21/2010
ARCHITECT/DESIGN TEAM:  325 Contracting Squadron - Civil Engineering
OWNER:  Tyndall AFB
CONTRACTING OFFICER:
  Airman Kyle Lauricella
                        Phone:   850-283-8645
SCOPE OF WORK:  Interior renovations to select areas in Building 225; construction of new pavilion outside of Building 225, and installation of new metal roof system on Building 225.
CONTRACT VALUE:  $804,098.00


PROJECT:  Replace/Install Air Conditioning/Compressor Unit
LOCATION:
  Federal Aviation Administration, Fulton Co. System Support
START DATE:  8/18/2010
FINISH DATE:
  11/1/2010
ARCHITECT/DESIGN TEAM:  N/A
OWNER: Federal Aviation Administration
CONTRACTING OFFICER:
  Ms. Susan Ball
                        Phone:   770-386-0225
SCOPE OF WORK:  Replaced an external air conditioning compressor unit.  This included removing the old compressor unit, installing a new air conditioning compressor, reconnecting power and refrigerant lines to the new compressor.  Tested and balanced the new compressor
CONTRACT VALUE:  $17,517
      
                                                                                                                   

PROJECT:  Building Envelope Improvements
LOCATION:
  Tyndall Air Force Base - Panama City, FL
START DATE:  04/24/2009
FINISH DATE:
  08/22/2009
ARCHITECT/DESIGN TEAM:  325 Contracting Squadron - Civil Engineering
OWNER:  Tyndall AFB
CONTRACTING OFFICER:
  Michelle Harwood
                        Phone:   850-283-8639
SCOPE OF WORK: Provide building envelope improvements to buildings 9718, 9480, 9848, 370, 295, 280, and 421. Work included installation of light fixture insulating covers on lay-light fixtures, BATT insulation, gable vents, and other insulation. 
CONTRACT VALUE:  $119,164.81
 
 



PROJECTEmergency Operations Center Audio/Visual Media Upgrades
LOCATION:   Tyndall Air Force Base - Panama City, FL
AWARD DATE:  10/26/2010
FINISH DATE:
  02/15/2011
ARCHITECT/DESIGN TEAM:  N/A
OWNER:   Tyndall AFB
CONTRACTING OFFICER:
  Scott Brindus
                        Phone:   850-283-8648
SCOPE OF WORK: Relocate existing AV equipment racks, replace existing A/V recorders with new equipment, provide and install 40" LCD monitors, install/program A/V switching equipment with remote log-in capability, provide/install wide angle surveillance cameras with DVR units, and install interior locks with magnetic card readers.
CONTRACT VALUE:  $81,930.26




Project:   Replace East Gate Building 3221 at Naval Air Station, Pensacola
Location: Pensacola Naval Air Station, Florida
Start Date: March 20, 2009
Finish Date: March 31, 2009
Architect/Design Team:  N/A
Owner:   Department of Defense- United States of America
                 Pensacola Naval Air Station
Contracting Officer:  Trudale Corbin
                        Phone:   850-452-3131 Ext: 3066
Scope of Work:   Fabricate and install new section of moveable security gate with motor and sensors
Contract Value: $6,884.00

1681 Success Drive, Ste 2
Cantonment, FL. 32533

850-937-8566

Fax: 850-937-8679